Exterior Projects
Feature Deck Project
Abris was contacted to complete an initial project inspection of 21 decks. From there, Abris created a quote outlining that some decks required complete joist replacement, others required one or two replacements and some required rim board replacement. This project took about a month to complete.

Before

After

Before

After
Feature Painting Project
Abris was contacted to complete an initial project inspection of 18 buildings. From there, Abris created a quote outlining that some buildings required more work than others, including stucco repairs and wood repairs. This project took about three months to complete.

Before stucco repair

After stucco repair
During painting
After painting
Feature Door Replacement Project
The board contacted Abris; they wanted to replace the dated, wood front doors with new industrial-style aluminum doors with glass inserts. The new doors were specifically ordered to fit the existing opening, and they were fitted with new locks that matched the existing keys, along with an electronic striker for keyless entry.

Before replacement

Before replacement

After replacement

After replacement